‘Hybrid tender’ weaving together seabed leases, subsidy support and grid links needed for nation to have 3GW installed by end of decade, says general director at national wind energy association AEE This post appeared first on Recharge News.

‘Hybrid tender’ weaving together seabed leases, subsidy support and grid links needed for nation to have 3GW installed by end of decade, says general director at national wind energy association AEE This post appeared first on Recharge News.