Poland-Lithuania Interconnector gas pipeline commissioned

The bidirectional natural gas interconnection between Poland and Lithuania (GIPL) was formally commissioned last week, connecting the Baltic and Finnish markets with the Polish market.This post appeared first on Oil & Gas Journal.

Share This Post

Share on linkedin
Share on twitter
Share on email