Svenska Kraftnät plans three to six connection points at sea by 2035 to which developers can link projects in part-waiver of transmission costs This post appeared first on Recharge News.

Svenska Kraftnät plans three to six connection points at sea by 2035 to which developers can link projects in part-waiver of transmission costs This post appeared first on Recharge News.