Record-setting Jan De Nul installation vessel’s first assignment will be erecting some 300 GE Haliade-X turbines at 3.6GW Dogger Bank mega-project being developed off UK by Equinor and SSE This post appeared first on Recharge News.

Record-setting Jan De Nul installation vessel’s first assignment will be erecting some 300 GE Haliade-X turbines at 3.6GW Dogger Bank mega-project being developed off UK by Equinor and SSE This post appeared first on Recharge News.