LNG Canada has taken delivery of the 14-million tonne/year liquefaction plant’s inlet module, the part of the system that will take delivery of natural gas transported on TC Energy’s Coastal GasLink pipeline.This post appeared first on Oil & Gas Journal.
Need reliable power? Consider dual-fuel capability
In a world with increasingly frequent severe weather events that may disrupt power supplies, a move to dual-fuel capabilities at power plants may make economic