Heckert Solar inaugurates 400 MW solar panel factory in Germany

<img width="1200" height="527" src="https://16iwyl195vvfgoqu3136p2ly-wpengine.netdna-ssl.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-1200×527.jpg" class="attachment-large size-large wp-post-image" alt loading="lazy" srcset="https://16iwyl195vvfgoqu3136p2ly-wpengine.netdna-ssl.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-1200×527.jpg 1200w, https://16iwyl195vvfgoqu3136p2ly-wpengine.netdna-ssl.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-600×264.jpg 600w, https://16iwyl195vvfgoqu3136p2ly-wpengine.netdna-ssl.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-768×338.jpg 768w, https://16iwyl195vvfgoqu3136p2ly-wpengine.netdna-ssl.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1.jpg 1536w" sizes="(max-width: 1200px) 100vw, 1200px" data-attachment-id="155058" data-permalink="https://www.pv-magazine.com/2021/09/30/heckert-solar-inaugurates-400-mw-solar-panel-factory-in-germany/heckert_solar_modulwerk_thueringen_2021-1536×675/" data-orig-file="https://www.pv-magazine.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1.jpg" data-orig-size="1536,675" data-comments-opened="1" data-image-meta="{"aperture":"5.6","credit":"11px photography","camera":"Canon EOS 80D","caption":"","created_timestamp":"1624982749","copyright":"","focal_length":"18","iso":"100","shutter_speed":"0.0015625","title":"","orientation":"1"}" data-image-title="Heckert_Solar_Modulwerk_Thueringen_2021-1536×675" data-image-description data-image-caption="

The new factory offers 24,000m2 of space for module production.

” data-medium-file=”https://www.pv-magazine.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-600×264.jpg” data-large-file=”https://www.pv-magazine.com/wp-content/uploads/2021/09/Heckert_Solar_Modulwerk_Thueringen_2021-1536×675-1-1200×527.jpg”>

From pv magazine Germany

German manufacturer Heckert Solar has commissioned its 400 MW panel factory in Langenwetzendorf, in the eastern German region of Thuringia.

The manufacturing facility will produce the company’s new module series NeMo® 3.0 120 M. The manufacturer invested a total of €21 million in its construction. The production equipment comes from Teamtechnik, 3D-Micromac and Ecoprogetti.

Popular content

The first production line is already in operation and extends over 8,000m2 of the 24,000m2 production hall. The new plant is more automated than the 400 MW factory that Heckert Solar operates at its headquarters in Chemnitz, eastern Germany.

In the future, production will be carried out in four shifts in Thuringia. After the ramp-up of the new production facility, Heckert Solar will have an annual production capacity of 800 MW and employ 275 people.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

This post appeared first on PV Magazine.

Share This Post

Share on linkedin
Share on twitter
Share on email