Gigascale floating wind-fuelled hydrogen hub off Wales gets oars in the water

First stage of 2.3GW Celtic Sea complex could be online as early as 2027, based on deal inked by developer Source Energie and electrolyser technology outfit ERM Dolphyn This post appeared first on Recharge News.

Share This Post